Bełchatów Power Plant
Flue Gas Desulphurization Installation on Units No. 8-12 at PGE GiEK Bełchatów Power Plant Branch
The scope of work included:
- installation of 6/0.4kV transformers;
- installation of low voltage switchboards;
- delivery and installation of cable routes;
- delivery and installation of medium voltage cables including connection;
- delivery and installation of low voltage cables including connection;
- delivery and installation of local control boxes and device power supply boxes;
- post-assembly checks and measurements
Installation of a power supply and control system for the ash removal of the electrostatic precipitator of unit no. 2 at the Bełchatów Power Plant and a lighting system for the entire electrostatic precipitator.
Scope of work:
- installation of cable routes,
- laying power and control cables along with their connection and marking
- post-assembly checks,
- installation of booms and lighting fixtures on the structure along with the installation of power distribution boards.
Date:
2025-10-09