Bełchatów Power Plant

Flue Gas Desulphurization Installation on Units No. 8-12 at PGE GiEK Bełchatów Power Plant Branch

The scope of work included:

  • installation of 6/0.4kV transformers;
  • installation of low voltage switchboards;
  • delivery and installation of cable routes;
  • delivery and installation of medium voltage cables including connection;
  • delivery and installation of low voltage cables including connection;
  • delivery and installation of local control boxes and device power supply boxes;
  • post-assembly checks and measurements

Installation of a power supply and control system for the ash removal of the electrostatic precipitator of unit no. 2 at the Bełchatów Power Plant and a lighting system for the entire electrostatic precipitator.

Scope of work:

  • installation of cable routes,
  • laying power and control cables along with their connection and marking
  • post-assembly checks,
  • installation of booms and lighting fixtures on the structure along with the installation of power distribution boards.
Date: