Kozienice Power Plant

Power supply and control system for SCR de-ashing and Electrostatic Precipitators of Unit No. 9 at Kozienice Power Plant

Scope of work included:

  • installation of necessary cable routes;
  • installation of low-voltage (LV) facility distribution boards and local control units;
  • installation and connection of power cables;
  • installation and connection of control cables and I systems;
  • post-installation measurements
Date: