PERN Fuel Base in Koluszki

Construction of 3×32,000 m3 storage tanks for class III petroleum products with accompanying infrastructure at the PERN Fuel Base in Koluszki

The scope of work included:

  • supply and installation of lighting for tanks and outdoor areas;
  • prefabrication, supply and installation of the main switchboard and tank-side switchboards;
  • supply and installation of UPS batteries;
  • supply and installation of pipeline heating system;
  • supply and installation of cable routes on tanks;
  • supply and installation of control and power cables;
  • supply and installation of overfill protection system;
  • supply and installation of inter-bottom space leak monitoring system;
  • supply and installation of hydrocarbon detection system;
  • supply and installation of telecommunications ducts;
  • supply and installation of video monitoring system;
  • supply and installation of emergency telephone system;
  • supply and installation of fiber optic connections;
  • connection of valves and technological equipment;
  • supply and installation of inter-facility cabling for instrumentation and control systems;
  • post-installation measurements, commissioning
Date: