PERN Fuel Base in Rejowiec

PERN, Fuel Base No. 4, construction of storage tanks No. 66 and 67 for liquid fuel with a capacity of 32,000m3 each

The following work was performed as part of the implementation:

  • installation of tank and external area lighting;
  • installation of tank-side distribution panels;
  • installation of cable routes on tanks;
  • installation of pipeline heating system;
  • installation of power, control and instrumentation cables;
  • installation of telecommunications cable management;
  • connection of technological equipment;
  • post-installation measurements;

Date: Q4 2020-Q1 2021

Date: