PERN Fuel Base in Rejowiec
PERN, Fuel Base No. 4, construction of storage tanks No. 66 and 67 for liquid fuel with a capacity of 32,000m3 each
The following work was performed as part of the implementation:
- installation of tank and external area lighting;
- installation of tank-side distribution panels;
- installation of cable routes on tanks;
- installation of pipeline heating system;
- installation of power, control and instrumentation cables;
- installation of telecommunications cable management;
- connection of technological equipment;
- post-installation measurements;
Date: Q4 2020-Q1 2021
Date:
2025-10-09

